Skip to content

Projects

Springdale Estates Wastewater Treatment Plant

Springdale Estates is a planned residential community in Mahoning Township, Carbon County. The existing wastewater treatment plant is over 25 years old. The treatment capacity of 12,600 gallons per day
Learn More

ArtsQuest

KCE supplied survey support (pre-survey calculations, plan review, file conversion, benchmark establishment, and field layout of column lines) for horizontal and vertical control at ArtsQuest’s SteelStacks Campus and the Performing
Learn More
Beth Works - Bethlehem PA

Beth Works – Bethlehem Steel

KCE was contracted by the Bethlehem Steel Corporation to provide comprehensive civil engineering services for the initial master redevelopment planning and installation of road and utility infrastructure as part of
Learn More

Route 100 Road Widening

Keystone Consulting Engineers, Inc. (KCE) was contracted by Upper Macungie Township in Lehigh County to manage this major, multi-million dollar capacity building project to alleviate severe traffic congestion on Rt.
Learn More

Mifflinburg Area School District – Former Laurelton Elementary School

A release occurred from an unregulated 10,000-gallon petroleum underground storage tank (UST) impacted soils, groundwater, and an adjacent stream. The remedial action consisted of excavation of the source area and
Learn More
Borough of Palmerton Fire Station

Borough of Palmerton Fire Station

KCE completed the design, permitting, competitive bid package preparation, and construction oversight for a new 2-story fire station building located at intersection of Fifth Street and Lehigh Avenue in the
Learn More
Moravian College Bethlehem PA

Moravian College Dormitory

Keystone Consulting Engineers, Inc. (KCE) provided comprehensive land development services to design and obtain requisite permits for a new dormitory at Moravian College in Bethlehem, PA. The new facility occupies
Learn More
cetronia ambulance corps

Cetronia Ambulance Corps. – Joint Operations Facility

Keystone Consulting Engineers, Inc. prepared the Land Development plans for this high-profile project that included 68,000 square-foot Joint Operations Facility that was delivered via a cooperative partnership between the Cetronia
Learn More

Contact Us

    Your Name (required)

    Your Email (required)

    Subject (required)

    If you know the office you would like to send this to, please select below:

    Your Message